Leoque Collection – One Look, One Collection – Philippine Furnitures, Living Room Furniture, Online Furniture Shop, Bedroom Funitures, Furniture Catalog, Furniture Blog, Dining Room Furniture, Philippines Furniture, Kids Furniture, Office Furniture, Furniture Store Philippines, Furnitures Design, Kitchen Furniture, Furniture Shopping Online, Accents & Accessories, Philippines Furniture Store, Outdoor Furniture, Hardwood Furniture, Interior Design, Furniture Design Philippines, Wood Furniture, Industrial Design, Philippine Handicrafts, Tropical Furniture, Custom Furniture, Designer Furniture, Arts & Crafts, Online Furniture Shopping




Chinese hotel construction time lapse video, building 15 storeys in 2 days

Posted on | November 13, 2010 |


Level 9 Earthquake Resistance: diagonal bracing structure, light weight, steel construction, passed level 9 earthquake resistance testing

6x Less Material: even though the construction materials are much lighter(250kg/m2) than the traditional materials(over 1500kg/m2), the floors and walls are solid with surefootedness, airtight and sound-proofing

5x Energy Efficient: 150mm thermal insulation for walls and roofs, triple glazed plastic windows, external solar shading, heat insulation, fresh air heat recovery, LED lighting, yearly HAVC A/C energy consumption equivalent to 7 liters oil.

20x Purification: after 3 levels of purification, the purification efficiency for fresh air reaches 95%-99.9%; air exchanged 1-2.5 times per hour, and indoor air is 20x cleaner than out door air

1% Construction Waste: all components are factory made, construction waste, mainly package materials, result from on site set-up only and amount to 1% of the total weight of the building.

This is the first building in human history which combines almost all environmental friendly, comfortable and secure elements.

So, we call it: Sustainable Building

Meanwhile, in the Philippines, it is reported that one 15-storey government building will be built but it will take 2 years for conceptualization and design, another 2 years for the bidding, and re-bidding, and more re-bidding. Lucky are the taxpayers if it the building is done inside 2 years.  Eco-friendly construction ways and pre-fab technology & methodology are already present and being done here in the Philippines, it’s the bureaucracy that delays the projects.


Popular Tags

abaca art bamboo bed bench book buddha candle holder center table chair clock coffee table console console table design desk dining chair dining set dining table divider floor lamp frame glass ig instagram kamagong lamp metal mirror photography pr rattan set shelves side table stainless steel stool storage table tv rack vase wall clock wood woodwork


Quick Links

  1. 1. Leoque Photos Copyright
  2. 2. Wannabe A LEOQUE Supplier?
  3. 3. Be Our Agent
  4. 4. Tools & Resources
  5. 5. Leoque Library
  6. 6. Furniture Clearance Sale
  7. 7. Recycled, Re-purposed


Recently Posted

Archives

Subscribe to our feed

Subscribe

Elsewhere

  • Instagram
  • View House of Leoque's profile on LinkedIn
  • Follow Me on Pinterest
  • Admin